Carleton College Utility Master Plan

Project Updates, Press & Presentations

Previous Page 1 Page 2 3 (Current Page) Page 4 Page 5 Next
  • Three Drilling Rigs on the Bald Spot

    Bald Spot Drilling Continues

    25 August 2018

    The Bald Spot is still undergoing its transformation from green space to green space PLUS a thermal battery for campus!

    • Read more of “Bald Spot Drilling Continues”
  • Hot water piping connecting to the Rec Center, you can see the main entrance in the background.

    Rec Center Conversion Complete

    21 August 2018

    The Rec Center got its facelift this summer as part of the Utility Master Plan.

    • Read more of “Rec Center Conversion Complete”
  • “Geothermal Under the Bald Spot” Presentation

    20 August 2018

    Martha Larson, Carleton’s Manager of Campus Energy and Sustainability, gave a presentation at Reunion 2018 titled “Geothermal Under the Bald Spot? Utility Master Planning for the 21st Century.” You can see a video of the presentation or view the presentation slides as a PDF.

    • Permalink for “Geothermal Under the Bald Spot” Presentation
  • Fiber optic cable is taped to geothermal tubing then placed down the bore

    Bald Spot Week 6: Installing Fiber Optic Cables

    30 July 2018

    Drillers and Carleton geology department members work to install fiber optic cables in the Bald Spot geothermal field.

    • Read more of “Bald Spot Week 6: Installing Fiber Optic Cables”
  • A Smart Investment Outside link

    5 July 2018

    President Steven Poskanzer details the changes that come along with the implementation of Carleton’s Utility Master Plan and goals of the Climate Action Plan. Read the article here.   

    • Permalink for A Smart Investment
  • Timeline of the Tunnels Outside link

    5 July 2018

    An entertaining (fictional) history of Carleton’s system of underground passageways is detailed in Carleton’s Voice magazine. Find it here.

    • Permalink for Timeline of the Tunnels
  • Geology Class Project Promotes Geothermal around Campus Outside link

    5 July 2018

    An article in Carleton’s alumni magazine the Voice focuses on the collaborative efforts between students in the Professor Mary Savina’s Introduction to Environmental Geology class and the sustainability office to help publicize the new geothermal system. Read the article online.

    • Permalink for Geology Class Project Promotes Geothermal around Campus
  • Carleton’s Geothermal System Featured in USGBC Article Outside link

    5 July 2018

    Carleton’s geothermal system was recently featured in USGBC article which highlights Carleton’s Utility Master Plan to shift the campus to a more economically and environmentally sustainable energy system. Read the article online.

    • Permalink for Carleton’s Geothermal System Featured in USGBC Article
  • Drilling Begins

    Bald Spot Week 2: Drilling Begins

    2 July 2018

    Drilling of the first geothermal borehole began earlier this week in the far northeast corner of the Bald Spot.

    • Read more of “Bald Spot Week 2: Drilling Begins”
  • Fenced Bald Spot

    Bald Spot Week 1: Site Mobilization in Preparation for Drill Rigs

    22 June 2018

    Preparation for drilling on the Bald Spot is underway! Meet the students who will be working on site this summer.

    • Read more of “Bald Spot Week 1: Site Mobilization in Preparation for Drill Rigs”
Previous Page 1 Page 2 3 (Current Page) Page 4 Page 5 Next
RSS
What is this?

FB icon  Twitter icon  Instagram icon  Snapchat icon

Categories

  • Bald Spot
  • Bell Field
  • Community News
  • Mini Bald Spot
  • Press & Presentations
  • Project Updates
  • UMP Home
    • The Plan
    • Planning Process
    • Charts & Graphs
    • Frequently Asked Questions
    • Fun Facts
    • Bore Field Maps
    • Project Updates, Press & Presentations
    • Project Team
    • Carleton Utilities History
    • Curricular Connections
    • End of Steam 2021

Carleton College Utility Master Plan pages maintained by the Web Services Group
This page was last updated on 11 August 2020
Carleton

One North College StNorthfield, MN 55057USA

507-222-4000

  • Facebook
  • Instagram
  • YouTube
  • Twitter
  • LinkedIn
  • Admissions
  • Academics
  • Athletics
  • About Carleton
  • Employment
  • Giving
  • A-Z Guide
  • Directory
  • Map
  • Photos
  • Events
  • News
  • for Alumni
  • for Students
  • for Faculty/Staff
  • for Families
  • Privacy
  • Accessibility
  • Terms of Use

Sign In