Capital Projects
- Hassenstab Hall – renovation
- Utility Master Plan – east side piping replacement and heating conversions: Boliou, CMC, Facilities, Laird, Leighton, Library, Stadium, West Gym
- Nourse Hall fan coil unit replacement
- Goodsell Observatory – HVAC conversion & sprinklers
Annual Classroom Improvements
- Hulings 310 – Neuroscience Lab Classroom
- LDC 241, 242, 243, 244, 302, 330, 335, & 345 – patching / painting walls, window blind replacement, replace several teaching stations
Annual Residence Hall Improvements
- Davis Hall restrooms
Facility Change Requests
- 216 College Street – TRIO House improvements: porch, windows, floors, and IT needs
- Cowling Gym – replace drinking fountain with water bottle filling station and add ceiling fans in dance studio
- Rec Center – remove sink intended for catering in loading dock area
- Stadium – improve overhead lighting in gold hitting room 214
- Weitz Center – remove wall-mounted workstation in museum 02 and add lighting storage brackets in Theater Shop 173
- West Gym – install steps/table to safely access whirlpool tub and add cubbies at the bottom of steps for shoes, jackets, etc.
- Weather Tower – install underground conduit from baseball field press box to weather tower
Building Envelope (roofs, windows, exteriors)
- Burton Hall – tuckpoint/windows (last phase)
- Davis Hall – tuckpoint and stone repair
- Prairie Warehouse – replace roof
- Townhouses – replace shingles
Interiors
- Hulings – Elevator upgrade
- Willis Hall – Building fire alarm system upgrades
Grounds Improvements
- Founders Court – donor recognition stone expansion
- Goodhue Bridge – replace decking and railing (closed all summer)
- Rec Center – entry road widening and resurfacing
- West Gym – replace hammer cage
- Willis Hall – install flagpole