Capital Projects

Hassenstab Hall – renovation
Utility Master Plan – east side piping replacement and heating conversions: Boliou, CMC, Facilities, Laird, Leighton, Library, Stadium, West Gym
Nourse Hall fan coil unit replacement
Goodsell Observatory – HVAC conversion & sprinklers

Annual Classroom Improvements

Hulings 310 – Neuroscience Lab Classroom
LDC 241, 242, 243, 244, 302, 330, 335, & 345 – patching / painting walls, window blind replacement, replace several teaching stations

Annual Residence Hall Improvements

Davis Hall restrooms

Facility Change Requests

216 College Street – TRIO House improvements: porch, windows, floors, and IT needs
Anderson Hall – add Chemistry display case in room 227
Cowling Gym – replace drinking fountain with water bottle filling station and add ceiling fans in dance studio
Rec Center – remove sink intended for catering in loading dock area
Stadium – improve overhead lighting in gold hitting room 214
Weitz Center – remove wall-mounted workstation in museum 02 and add lighting storage brackets in Theater Shop 173
West Gym – install steps/table to safely access whirlpool tub and add cubbies at the bottom of steps for shoes, jackets, etc.
Weather Tower – install underground conduit from baseball field press box to weather tower

Building Envelope (roofs, windows, exteriors)

Burton Hall – tuckpoint/windows (last phase)
Davis Hall – tuckpoint and stone repair
Prairie Warehouse – replace roof
Townhouses – replace shingles

Interiors

Hulings – Elevator upgrade
Willis Hall – Building fire alarm system upgrades

Grounds Improvements

Founders Court – donor recognition stone expansion
Goodhue Bridge – replace decking and railing (closed all summer)
Rec Center – entry road widening and resurfacing
West Gym – replace hammer cage
Willis Hall – install flagpole