Capital Projects

Weitz Center Music & Performance Commons addition    
Science Project
Utility Master Plan (phase 1): East Energy Station in Science Addition, geothermal well drilling at Bell field and Mini Bald Spot

Annual Classroom Improvements

Boliou 104 paint sidewalls with whiteboard paint
LDC 104 new tablet arm chairs
Leighton 304 chalkboard reconfiguration
Weitz Center 235 cabinet installation and tech upgrades

Facility Change Requests & Department Projects

Gould Library add cold storage freezer in archival vault
Cowling Storage/Training Room reconfigure space
Hulings 203A lab renovations
Lower Arb add sidewalk
Outdoor sand volleyball repairs
West Gym Locker Room 122 resurface flooring
West Gym Men’s Locker Room flooring replaced
West Gym Pool add starting blocks
Student Activities add athletic equipment storage shed and warming house
Sayles-Hill 253 meeting room AV upgrades and improvements

Annual Residence Hall Improvements

Townhouse interior upgrades phase 1 of 2

Building Envelope (roofs, windows, exteriors)

Roof Replacement

CMC
Myers
Severance phase 2 of 2
Watson
Add fall protection to various campus roofs

Tuck-pointing

Evans tuck-pointing phase 2 of 2

Interiors

Johnson House
CMC carpet replacement
Rec Center Fieldhouse flooring replacement

Grounds Improvements

Pave College Street near Scoville Hall
Laird Stadium field irrigation expansion and re-sod
Stewsie and Mai Fete Island shore stabilization