Capital Projects
- Weitz Center Music & Performance Commons addition
- Science Complex Project
- Utility Master Plan (phase 1): East Energy Station in Science Addition, geothermal well drilling at Bell field and Mini Bald Spot
Annual Classroom Improvements
- Boliou 104 paint sidewalls with whiteboard paint
- LDC 104 new tablet armchairs
- Leighton 304 chalkboard reconfiguration
- Weitz Center 235 cabinet installation and tech upgrades
Facility Change Requests & Department Projects
- Gould Library – add cold storage freezer in archival vault
- Cowling Storage/Training Room – reconfigure space
- Hulings 203A – lab renovations
- Lower Arb – add sidewalk
- Outdoor sand volleyball repairs
- West Gym Locker Room 122 – resurface flooring
- West Gym Men’s Locker Room – flooring replaced
- West Gym Pool – add starting blocks
- Student Activities – add athletic equipment storage shed and warming house
- Sayles-Hill 253 meeting room – AV upgrades and improvements
Annual Residence Hall Improvements
- Townhouse interior upgrades phase 1 of 2
Building Envelope (roofs, windows, exteriors)
Roof Replacement
- CMC
- Myers
- Severance phase 2 of 2
- Watson
- Add fall protection to various campus roofs
Tuck-pointing
- Evans tuck-pointing phase 2 of 2
Interiors
- Johnson House
- CMC carpet replacement
- Rec Center Fieldhouse flooring replacement
Grounds Improvements
- Pave College Street near Scoville Hall
- Laird Stadium field irrigation expansion and re-sod
- Stewsie and Mai Fete Island shore stabilization