Capital Projects

  • Weitz Center Music & Performance Commons addition    
  • Science Complex Project
  • Utility Master Plan (phase 1): East Energy Station in Science Addition, geothermal well drilling at Bell field and Mini Bald Spot

Annual Classroom Improvements

  • Boliou 104 paint sidewalls with whiteboard paint
  • LDC 104 new tablet armchairs
  • Leighton 304 chalkboard reconfiguration
  • Weitz Center 235 cabinet installation and tech upgrades

Facility Change Requests & Department Projects

  • Gould Library – add cold storage freezer in archival vault
  • Cowling Storage/Training Room – reconfigure space
  • Hulings 203A – lab renovations
  • Lower Arb – add sidewalk
  • Outdoor sand volleyball repairs
  • West Gym Locker Room 122 – resurface flooring
  • West Gym Men’s Locker Room – flooring replaced
  • West Gym Pool – add starting blocks
  • Student Activities – add athletic equipment storage shed and warming house
  • Sayles-Hill 253 meeting room – AV upgrades and improvements

Annual Residence Hall Improvements

  • Townhouse interior upgrades phase 1 of 2

Building Envelope (roofs, windows, exteriors)

Roof Replacement

  • CMC
  • Myers
  • Severance phase 2 of 2
  • Watson
  • Add fall protection to various campus roofs

Tuck-pointing

  • Evans tuck-pointing phase 2 of 2

Interiors

  • Johnson House
  • CMC carpet replacement
  • Rec Center Fieldhouse flooring replacement

Grounds Improvements

  • Pave College Street near Scoville Hall
  • Laird Stadium field irrigation expansion and re-sod
  • Stewsie and Mai Fete Island shore stabilization